The SDG 3 Problem
No Electricity→No Cold Chain→Vaccines Spoil→Preventable Deaths
The biggest barrier to SDG 3 is not always a lack of doctors. Without electricity, rural clinics cannot maintain cold chains. DarkMAP identifies unelectrified villages and calculates the exact cost to connect them — the foundational data for any UNDP or World Bank ESMAP grant proposal.
Satellite data research, pipeline scripting, IJHSR publication track.
A
Aaron Qin
Backend Engineering
API infrastructure, data pipeline backend, server architecture, Devpost integration.
Phase 1 Validation — Kampong Speu, Cambodia
Phase 1 complete. NASA Earthdata VIIRS granules were processed through the full ML pipeline for Kampong Speu Province. Results below are live system outputs, not projections.
$239,097
Electrification Cost
55.7%
Confidence
0.365
NTL Radiance
29.3km
Grid Distance
5/100m²
Population
TIER 2
Priority
SDG 3 Direct Link: The $239,097 cost to grid-connect this village at 11.39286°N, 104.50406°E enables vaccine refrigeration at the local clinic. This figure is grant-proposal ready for World Bank ESMAP and UNDP.